Cisco 3850 Series Power Supply PWR-C1-1100WAC
Product Specification:
Cisco 3850 Series Power Supply - PWR-C1-1100WAC 1100W AC Config 1 Power Supply for 3850
Series.
PWR-C1-1100WAC Specification |
|
Power supply rated maximum |
1100W |
Total output BTU (Note: 1000 BTU/hr = 293W) |
3793 BTU/hr, 1100W |
Input-voltage range and frequency |
115-240VAC, 50-60 Hz |
Input current |
12-6A |
Output ratings |
-56V at 19.64A |
Output holdup time |
10 ms minimum at 102.5VAC |
Power-supply input receptacles |
IEC 320-C16 (IEC60320-C16) |
Power cord rating |
13A |
Physical specifications |
(H x W x D): 1.58 X 3.25 X 13.7 in Weight: 3 lb |
Operating temperature |
23 to 113°F (-5 to 45°C) |
Storage temperature |
-40 to 158°F (-40 to 70°C) |
Relative humidity operating and nonoperating noncondensing |
5 to 90% noncondensing |
Altitude |
10,000 ft. (3000 meters), up to 45°C |
MTBF |
Calculated MTBF must be greater than 300,000 using Telcordia SR-332, Method 1, Case 3. Demonstrated MTBF is 500,000 hr (with 90% confidence level). |
EMI and EMC compliance |
FCC Part 15 (CFR 47) Class A ICES-003 Class A EN 55022 Class A CISPR 22 Class A AS/NZS 3548 Class A BSMI Class A (AC input models only) VCCI Class A EN 55024, EN300386, EN 50082-1, EN 61000-3-2, EN 61000-3-3 EN61000-4-2, EN61000-4-3, EN61000-4-4, EN61000-4-5, EN61000-4-6, EN 61000-6-1 |
Safety compliance |
UL 60950-1, CAN/CSA-C22.2 No. 60950-1, EN 60950-1, IEC 60950-1, CCC, CE Marking |
LED indicators |
“AC OK”: Input power to the power supply is OK “PS OK”: Output power from the power supply is OK |
Cisco 3850 Series Power Supply PWR-C1-1100WAC= is sealed in cisco original box. We will also
pack PWR-C1-1100WAC= with second box before shipping.
Our products will be send via FedEx,DHL,TNT,UPS,EMS and so on.but the buyer is responsible for
customs clearance and pay tariff when the product arrived destination country.
Shipping Methods |
|
|
2-4 business days. |
|
2-4 business days |
|
2-4 business days |
|
5-7 business days. |
Payment Method
T/T,Western Union, HSBC and Money Gram will be accept.Faster payment will help you to get the
items earlier.